Space without limits.

Modular meeting rooms on a 900 mm grid, designed to open, enclose and reconfigure as your workplace changes.

MX modular rooms in a workplace

Your room.
Your configuration.

Explore the MX 900 mm modular system. Start with a footprint, then shape its boundary and interior.

Drag to turn · use arrow keys

MX 4 × 3 · 3600 × 2700 mm nominal grid

Concept visualisation. Nominal grid dimensions exclude project allowances. Final wall, door and service positions follow the approved drawing.

Boundary
Finish direction

Colour directions are illustrative. Materials, lighting, ventilation, electrical provision and furniture are coordinated for your project.

Enquire about this room

MX collection.

9 models and configurations.

From open
to enclosed.

Use modular walls, glass and adjustable louvers to define a boundary. The MX system is designed to support connection, relaxation, collaboration and concentration.

Discuss your configuration
MX product detail

Define a room. Keep the possibilities.

The MX flyer explores boundaries and layouts that can support different activities in the same workplace. Start with the nominal modular grid, then coordinate the enclosure, furniture and services. The final approved drawing defines your installation.

View the current MX flyer

Image and collection direction from the supplied MUSEPoD 26V10 flyer. Confirm the selected model and equipment with your quotation.

Built to come together.

Explore the layers and connections behind the MX modular room.

From a grid to a working room.

The grid is the starting point. The approved layout makes it a project.

Set the room’s purpose

Decide how many people need to meet, present or work. Test the furniture and circulation within the nominal footprint before choosing a boundary.

Choose how it connects

Discuss glazed, opaque and louvered boundaries against privacy, visibility and the surrounding workplace. The preview communicates a concept, not a final engineering drawing.

Coordinate the whole room

Confirm doors, lighting, power, airflow and building-service interfaces. Final external dimensions, height and installation scope belong in the approved project documents.

Make room
for better.

Tell us how your space needs to work. We’ll help you find the right configuration.

Start your project